Improving construction project scheduling performance amid Covid-19 Pandemic /

Saved in:
Bibliographic Details
Main Author: Lu, Haw Zheng (Author)
Format: Thesis Book
Language:English
Published: 2022.
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 01066nam a2200301 i 4500
001 u1160156
003 SIRSI
005 202212301020
008 221230s2022 my a m 000 0 eng
040 |a UMM  |e rda 
090 |a HD1394  |b UM 2022 Lu 
100 1 |a Lu, Haw Zheng,  |e author. 
245 1 0 |a Improving construction project scheduling performance amid Covid-19 Pandemic /  |c Lu Haw Zheng. 
264 1 |c 2022. 
300 |a xv, 75 leaves :  |b illustrations ;  |c 30 cm 
336 |a text  |2 rdacontent 
336 |a still image  |2 rdacontent 
337 |a unmediated  |2 rdamedia 
337 |a computer  |2 rdamedia 
338 |a volume  |2 rdacarrier 
338 |a computer disc  |2 rdacarrier 
502 |b M.(P.Mgmt)  |c Jabatan Ukur Bahan, Fakulti Alam Bina, Universiti Malaya  |d 2022. 
504 |a Bibliography: leaves 71-75. 
530 |a Also issued in CD. 
710 2 |a Universiti Malaya.  |b Jabatan Ukur Bahan,  |e degree granting institution. 
900 |a mia 
596 |a 11 
999 |a XX(1160156.1)  |w LC  |c 1  |i 1160156-1001  |l INPROCESS  |m P11ALMBINA  |r Y  |s Y  |t TESIS  |u 11/1/2023  |0 FAB  |o .STAFF.