Ramanathan Ramanathan. (1995). Financial feasibility study on the construction of Changi Airport Terminal 3 using build-operate-transfer (BOT) financing scheme.
Chicago Style (17th ed.) CitationRamanathan Ramanathan. Financial Feasibility Study on the Construction of Changi Airport Terminal 3 Using Build-operate-transfer (BOT) Financing Scheme. 1995.
MLA引文Ramanathan Ramanathan. Financial Feasibility Study on the Construction of Changi Airport Terminal 3 Using Build-operate-transfer (BOT) Financing Scheme. 1995.
警告:这些引文格式不一定是100%准确.