Financial feasibility study on the construction of Changi Airport Terminal 3 using build-operate-transfer (BOT) financing scheme /

Saved in:
Bibliographic Details
Main Author: Ramanathan Ramanathan
Format: Thesis Book
Language:English
Published: 1995
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Physical Description:xi, 126 leaves : ill. ; 30 cm.
Bibliography:Bibliography: leaves 123-126.