Financial feasibility study on the construction of Changi Airport Terminal 3 using build-operate-transfer (BOT) financing scheme /
Saved in:
Main Author: | |
---|---|
Format: | Thesis Book |
Language: | English |
Published: |
1995
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
LEADER | 01048cam a2200277 a 4500 | ||
---|---|---|---|
001 | u378185 | ||
003 | SIRSI | ||
008 | 940421s1995 si v 00 1 eng m | ||
035 | |a ABW-8535 | ||
040 | |a UMM | ||
043 | |a a-si--- | ||
090 | |a HE9797.5 |b S55Ram | ||
100 | 0 | 0 | |a Ramanathan Ramanathan. |
245 | 1 | 0 | |a Financial feasibility study on the construction of Changi Airport Terminal 3 using build-operate-transfer (BOT) financing scheme / |c by Ramanathan s/o Ramanathan. |
260 | |c 1995 | ||
300 | |a xi, 126 leaves : |b ill. ; |c 30 cm. | ||
502 | |a Dissertation (M.B.A.) -- National University of Singapore, 1995. | ||
504 | |a Bibliography: leaves 123-126. | ||
610 | 2 | 0 | |a Changi Airport. |
650 | 0 | |a Construction industry |z Singapore |x Finance. | |
650 | 0 | |a International airports |z Singapore. | |
650 | 0 | |a Project management |z Singapore |x Finance. | |
650 | 0 | |a Privatization |z Singapore |x Case studies | |
948 | |a 02/08/1995 |b 05/11/2001 | ||
596 | |a 1 | ||
999 | |a HE9797.5 S55RAM |w LC |c 1 |i A505406215 |d 7/3/2000 |l STACKS |m P01UTAMA |n 6 |r Y |s Y |t TESIS |u 8/4/1996 |