Financial feasibility study on the construction of Changi Airport Terminal 3 using build-operate-transfer (BOT) financing scheme /

Saved in:
Bibliographic Details
Main Author: Ramanathan Ramanathan
Format: Thesis Book
Language:English
Published: 1995
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 01048cam a2200277 a 4500
001 u378185
003 SIRSI
008 940421s1995 si v 00 1 eng m
035 |a ABW-8535 
040 |a UMM 
043 |a a-si--- 
090 |a HE9797.5  |b S55Ram 
100 0 0 |a Ramanathan Ramanathan. 
245 1 0 |a Financial feasibility study on the construction of Changi Airport Terminal 3 using build-operate-transfer (BOT) financing scheme /  |c by Ramanathan s/o Ramanathan. 
260 |c 1995 
300 |a xi, 126 leaves :  |b ill. ;  |c 30 cm. 
502 |a Dissertation (M.B.A.) -- National University of Singapore, 1995. 
504 |a Bibliography: leaves 123-126. 
610 2 0 |a Changi Airport. 
650 0 |a Construction industry  |z Singapore  |x Finance. 
650 0 |a International airports  |z Singapore. 
650 0 |a Project management  |z Singapore  |x Finance. 
650 0 |a Privatization  |z Singapore  |x Case studies 
948 |a 02/08/1995  |b 05/11/2001 
596 |a 1 
999 |a HE9797.5 S55RAM  |w LC  |c 1  |i A505406215  |d 7/3/2000  |l STACKS  |m P01UTAMA  |n 6  |r Y  |s Y  |t TESIS  |u 8/4/1996