Tenaga Nasional Berhad Sultan Idris - II Hydro Power Station : a proposal for transformation from conventional power generating station into a strategic business unit /
Saved in:
Main Author: | |
---|---|
Format: | Thesis Book |
Language: | English |
Published: |
1996.
|
Subjects: | |
Online Access: | http://studentsrepo.um.edu.my/id/eprint/2436 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
LEADER | 01517cam a2200337 a 4500 | ||
---|---|---|---|
001 | u399438 | ||
003 | SIRSI | ||
008 | 951026s1996 my ab t 00 1 eng m | ||
035 | |a ACA-6734 | ||
040 | |a UMM |d UME | ||
043 | |a a-my--- | ||
090 | |a HD9685 |b M42Mohzj | ||
091 | |a Microfiche 13009 | ||
099 | |a 658.401 2-595 |b Moh | ||
100 | 0 | 0 | |a Mohammad Zaki Jalaludin. |
245 | 1 | 0 | |a Tenaga Nasional Berhad Sultan Idris - II Hydro Power Station : |b a proposal for transformation from conventional power generating station into a strategic business unit / |c Mohammad Zaki bin Jalaludin. |
260 | |c 1996. | ||
300 | |a viii, 82 leaves [appen.] |b ill., map ; |c 30 cm. | ||
500 | |a Also available on microfiche. Kuala Lumpur : Perpustakaan Universiti Malaya, 1997. 2 fiches : negative ; 11x15 cm. | ||
502 | |a Dissertation (M.B.A.) -- Fakulti Ekonomi dan Pentadbiran, Universiti Malaya, 1996. | ||
504 | |a Bibliography: leaves 45. | ||
610 | 2 | 0 | |a Tenaga Nasional Bhd. |x Management. |
650 | 0 | |a Electric power systems |z Malaysia |x Management. | |
650 | 0 | |a Hydroelectric power plants |z Malaysia. | |
650 | 0 | |a Strategic planning |z Malaysia. | |
710 | 2 | 0 | |a Universiti Malaya. |b Fakulti Ekonomi dan Pentadbiran. |
856 | 4 | 1 | |u http://studentsrepo.um.edu.my/id/eprint/2436 |
948 | |a 18/07/1996 |b 25/11/2000 | ||
596 | |a 1 9 | ||
999 | |a HD9685 M42MOHZJ |w LC |c 1 |i A505989524 |d 28/2/1997 |l STACKS |m P01UTAMA |n 1 |r Y |s Y |t TESIS |u 31/12/1996 | ||
999 | |a TESIS 658.401 2-595 MOH |w LC |c 1 |i A505633836 |l DISCARD |m P09EKONOMI |r Y |s Y |t TESIS |u 11/9/1996 |