Tenaga Nasional Berhad Sultan Idris - II Hydro Power Station : a proposal for transformation from conventional power generating station into a strategic business unit /
Saved in:
Main Author: | Mohammad Zaki Jalaludin |
---|---|
Format: | Thesis Book |
Language: | English |
Published: |
1996.
|
Subjects: | |
Online Access: | http://studentsrepo.um.edu.my/id/eprint/2436 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Improving performance in the operations of supply management centre, Tenaga Nasional Berhad - Wilayah Persekutuan (SMC-WP) /
by: Nair, Mohandass S.
Published: (1997) -
A novel scheduling slippage indicator for performance deviation tracking and project managerial issues at the Sultan Ismail Power Station combined-cycle conversion project Tenaga Nasional /
by: Rubanathan, Lourdes
Published: (1997) -
Impact of privatization on Tenaga Nasional Berhad hydro personnel /
by: Jamal Yusoff
Published: (1997) -
Cash management in Tenaga Nasional : a study on maximizing return on collection /
by: Azhari Sulaiman
Published: (1996) -
Perception of Remaco personnel on the detachment of repair and maintenance functions from TNB power stations /
by: Ahmad Zaki Abdul Rahman
Published: (1996)