A novel scheduling slippage indicator for performance deviation tracking and project managerial issues at the Sultan Ismail Power Station combined-cycle conversion project Tenaga Nasional /

Saved in:
Bibliographic Details
Main Author: Rubanathan, Lourdes
Format: Thesis Book
Language:English
Published: 1997.
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 01269cam a2200289 a 4500
001 u415970
003 SIRSI
008 940809s1997 my a t 00 1 eng m
035 |a ACD-8669 
040 |a UMM 
043 |a a-my--- 
090 |a HD9685  |b M42Rub 
091 |a Microfiche 13660. 
100 1 0 |a Rubanathan, Lourdes. 
245 1 2 |a A novel scheduling slippage indicator for performance deviation tracking and project managerial issues at the Sultan Ismail Power Station combined-cycle conversion project Tenaga Nasional /  |c Lourdes Rubanathan. 
260 |c 1997. 
300 |a 107 leaves [append.] :  |b ill. ;  |c 30 cm. 
500 |a Microfiche. Kuala Lumpur : University of Malaya Library, 1998. 2 fiches : negative ; 11 x 15 cm. 
502 |a Dissertation (M.B.A) -- Fakulti Ekonomi dan Pentadbiran, Universiti Malaya, 1997. 
504 |a Bibliography: 54 leaves 
610 2 0 |a Tenaga Nasional Bhd.  |x Management. 
650 0 |a Electric power-plants  |x Design and construction.  |z Malaysia  |x Management  |x Case studies. 
650 0 |a Project management  |z Malaysia  |x Evaluation. 
710 2 0 |a Universiti Malaya.  |b Fakulti Ekonomi dan Pentadbiran. 
948 |a 17/09/1997  |b 30/05/2002 
596 |a 1 
999 |a HD9685 M42RUB  |w LC  |c 1  |i A507469878  |l STACKS  |m P01UTAMA  |r Y  |s Y  |t TESIS  |u 17/2/1998