A novel scheduling slippage indicator for performance deviation tracking and project managerial issues at the Sultan Ismail Power Station combined-cycle conversion project Tenaga Nasional /
Saved in:
Main Author: | |
---|---|
Format: | Thesis Book |
Language: | English |
Published: |
1997.
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
LEADER | 01269cam a2200289 a 4500 | ||
---|---|---|---|
001 | u415970 | ||
003 | SIRSI | ||
008 | 940809s1997 my a t 00 1 eng m | ||
035 | |a ACD-8669 | ||
040 | |a UMM | ||
043 | |a a-my--- | ||
090 | |a HD9685 |b M42Rub | ||
091 | |a Microfiche 13660. | ||
100 | 1 | 0 | |a Rubanathan, Lourdes. |
245 | 1 | 2 | |a A novel scheduling slippage indicator for performance deviation tracking and project managerial issues at the Sultan Ismail Power Station combined-cycle conversion project Tenaga Nasional / |c Lourdes Rubanathan. |
260 | |c 1997. | ||
300 | |a 107 leaves [append.] : |b ill. ; |c 30 cm. | ||
500 | |a Microfiche. Kuala Lumpur : University of Malaya Library, 1998. 2 fiches : negative ; 11 x 15 cm. | ||
502 | |a Dissertation (M.B.A) -- Fakulti Ekonomi dan Pentadbiran, Universiti Malaya, 1997. | ||
504 | |a Bibliography: 54 leaves | ||
610 | 2 | 0 | |a Tenaga Nasional Bhd. |x Management. |
650 | 0 | |a Electric power-plants |x Design and construction. |z Malaysia |x Management |x Case studies. | |
650 | 0 | |a Project management |z Malaysia |x Evaluation. | |
710 | 2 | 0 | |a Universiti Malaya. |b Fakulti Ekonomi dan Pentadbiran. |
948 | |a 17/09/1997 |b 30/05/2002 | ||
596 | |a 1 | ||
999 | |a HD9685 M42RUB |w LC |c 1 |i A507469878 |l STACKS |m P01UTAMA |r Y |s Y |t TESIS |u 17/2/1998 |