Building process modelling using product modelling methodology and its application to scheduling /
Saved in:
Main Author: | |
---|---|
Format: | Thesis Book |
Language: | English |
Published: |
1998.
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
LEADER | 00882cam a2200241 a 4500 | ||
---|---|---|---|
001 | u430341 | ||
003 | SIRSI | ||
008 | 981015s1998 si v 00 1 eng m | ||
035 | |a ACF-9292 | ||
040 | |a UMM | ||
090 | |a TH438.4 |b Zho | ||
100 | 1 | 0 | |a Zhong, Qi. |
245 | 1 | 0 | |a Building process modelling using product modelling methodology and its application to scheduling / |c by Zhong Qi. |
260 | |c 1998. | ||
300 | |a xi, 205 leaves : |b ill. ; |c 30 cm. | ||
502 | |a Thesis (Ph.D.) -- National University of singapore, 1998. | ||
504 | |a Bibliography: leaves 145-154. | ||
650 | 0 | |a Construction industry |x Management |x Data processing. | |
650 | 0 | |a Building |x Data processing. | |
650 | 0 | |a Production scheduling |x Mathematical models. | |
948 | |a 15/10/1998 |b 15/02/1999 | ||
596 | |a 1 | ||
999 | |a TH438.4 ZHO |w LC |c 1 |i A508249685 |d 18/10/2007 |e 18/10/2007 |l STACKS |m P01UTAMA |n 2 |r Y |s Y |t TESIS |u 19/2/1999 |