Application of cost significance technique to time and cost control of construction projects /

Saved in:
Bibliographic Details
Main Author: Sin, Wai Meng
Format: Thesis Book
Language:English
Published: 1995.
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 00866cam a2200241 a 4500
001 u436497
003 SIRSI
008 990313s1995 si v 00 1 eng m
035 |a ACG-7763 
040 |a UMM 
090 |a HD9715  |b A2Sin 
100 1 0 |a Sin, Wai Meng 
245 1 0 |a Application of cost significance technique to time and cost control of construction projects /  |c by Sin Wai Meng. 
260 |c 1995. 
300 |a x, 128 leaves :  |b ill. ;  |c 30 cm. 
502 |a Dissertation (M.Sc.) -- National University of Singapore, 1995. 
504 |a Bibliography: leaves 96-97. 
650 0 |a Construction industry  |x Management 
650 0 |a Construction industry  |x Cost control 
650 0 |a Construction industry  |x Production control. 
948 |a 15/03/1999  |b 22/03/1999 
596 |a 1 
999 |a HD9715 A2SIN  |w LC  |c 1  |i A508382030  |d 6/6/2001  |l STACKS  |m P01UTAMA  |n 6  |r Y  |s Y  |t TESIS  |u 14/4/1999