Chew, W. Y. (2000). Factor Criteria Metric (FCM) for requirements analysis phase in the development of management information systems.
Chicago Style (17th ed.) CitationChew, Wei Yin. Factor Criteria Metric (FCM) for Requirements Analysis Phase in the Development of Management Information Systems. 2000.
MLA (8th ed.) CitationChew, Wei Yin. Factor Criteria Metric (FCM) for Requirements Analysis Phase in the Development of Management Information Systems. 2000.
Warning: These citations may not always be 100% accurate.