Scheduling of a dynamic job shop with multiple job routes using the analytical hierarchical process (AHP) /
Saved in:
Main Author: | |
---|---|
Format: | Thesis Book |
Language: | English |
Published: |
2000.
|
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
LEADER | 00778nam a2200205 a 4500 | ||
---|---|---|---|
001 | u506538 | ||
003 | SIRSI | ||
008 | 021115s2000 si a v 00 10 eng m | ||
035 | |a ACW-3385 | ||
040 | |a UMM | ||
090 | |a TJ7 |b NUS 2000 Lee | ||
100 | 1 | 0 | |a Lee, William Gan Kai. |
245 | 1 | 0 | |a Scheduling of a dynamic job shop with multiple job routes using the analytical hierarchical process (AHP) / |c Lee Gan Kai, William. |
260 | |c 2000. | ||
300 | |a vi, 55 leaves : |b ill. ; |c 30 cm. | ||
502 | |a Dissertation (M.Eng.) -- National University of Singapore, 2000. | ||
504 | |a Bibliography: leaves 52-55. | ||
948 | |a 15/11/2002 |b 15/11/2002 | ||
596 | |a 1 | ||
999 | |a TJ7 NUS 2000 LEE |w LC |c 1 |i A510552646 |d 10/4/2014 |e 10/4/2014 |l B_KOM4 |m P01UTAMA |n 2 |r Y |s Y |t TESIS |u 27/11/2002 |o .PUBLIC. BKOM 4 : 45232 |