Optimal scheduling in multistage batch plants with parallel units /

Saved in:
Bibliographic Details
Main Author: Gupta, Sushant
Format: Thesis Book
Language:English
Published: 2002.
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 00693nam a2200205 a 4500
001 u509049
003 SIRSI
008 991117s2002 si v 00 eng
035 |a ACX-2035 
040 |a UMM 
090 |a TP7  |b NUS 2002 Gup 
100 1 0 |a Gupta, Sushant 
245 1 0 |a Optimal scheduling in multistage batch plants with parallel units /  |c by Li Bo. 
260 |c 2002. 
300 |a xvii, 148 leaves :  |b ill. ;  |c 30 cm. 
502 |a Dissertation (M.Sc.) -- National University of Singapore, 2002. 
504 |a Bibliography: p. 119-122. 
948 |a 26/02/2003  |b 26/02/2003 
596 |a 1 
999 |a TP7 NUS 2002 GUP  |w LC  |c 1  |i A510987801  |l B_KOM4  |m P01UTAMA  |r Y  |s Y  |t TESIS  |u 11/3/2003  |o .PUBLIC. bkom 4 : 43325