Production scheduling for precast plants /
Saved in:
Main Author: | |
---|---|
Format: | Thesis Book |
Language: | English |
Published: |
2000.
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
LEADER | 00831cam a2200229 a 4500 | ||
---|---|---|---|
001 | u691992 | ||
003 | SIRSI | ||
008 | 021120s2000 si a v 00 10 eng m | ||
035 | |a ACW-3993 | ||
040 | |a UMM | ||
090 | |a TA145 |b NUSP 2000 Hu | ||
100 | 1 | 0 | |a Hu, Hao. |
245 | 1 | 0 | |a Production scheduling for precast plants / |c Hu Hao. |
260 | |c 2000. | ||
300 | |a xi, 160 leaves : |b ill. ; |c 30 cm. | ||
502 | |a Thesis (Ph.D.) -- Dept. of Civil Engineering, Faculty of Engineering, National University of Singapore, 2000. | ||
504 | |a Bibliography: leaves 145-153. | ||
650 | 0 | |a Precast concrete. | |
650 | 0 | |a Production scheduling |x Mathematical models. | |
948 | |a 20/11/2002 |b 20/11/2002 | ||
596 | |a 1 | ||
999 | |a TA145 NUSP 2000 HU |w LC |c 1 |i A510670849 |d 25/8/2006 |f 25/8/2006 |g 1 |l B_KOM4 |m P01UTAMA |r Y |s Y |t TESIS |u 13/7/2005 |o .PUBLIC. BKOM 4 : 45109 |