Value management as an aid to communication during design stage in Klang Valley construction industry /
Saved in:
Main Author: | |
---|---|
Format: | Thesis Book |
Language: | English |
Published: |
2004.
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
LEADER | 01336cam a2200289 a 4500 | ||
---|---|---|---|
001 | u696912 | ||
003 | SIRSI | ||
008 | 040701s2004 my a t 00 10 eng m | ||
035 | |a ADB-7330 | ||
040 | |a UMM |d UMAB | ||
043 | |a a-my--- | ||
090 | |a TH145 |b UM 2004 Imray | ||
097 | |a TH145 |b UM 2004 Imray | ||
100 | 0 | 0 | |a Imran Ariff Yahya. |
245 | 1 | 0 | |a Value management as an aid to communication during design stage in Klang Valley construction industry / |c Imran Ariff Yahya. |
260 | |c 2004. | ||
300 | |a xiii, 211 leaves : |b ill. ; |c 30 cm. | ||
502 | |a Dissertation (M.Sc. (Building)) -- Jabatan Ukur Bangunan, Fakulti Alam Bina, Universiti Malaya, 2004. | ||
650 | 0 | |a Construction industry |z Malaysia |x Communication systems |x Management. | |
650 | 0 | |a Business communication |z Malaysia. | |
650 | 0 | |a Communication in management. | |
710 | 2 | 0 | |a Universiti Malaya. |b Fakulti Alam Bina |
948 | |a 01/07/2004 |b 19/08/2004 | ||
596 | |a 1 11 | ||
999 | |a TH145 UM 2004 IMRAY |w LC |c 1 |i A511570062 |d 10/2/2018 |e 10/2/2018 |f 18/4/2005 |g 1 |l STACKS |m P01UTAMA |n 7 |r Y |s Y |t TESIS |u 17/12/2004 | ||
999 | |a TH145 UM 2004 IMRAY |w LC |c 1 |i A511226989 |d 27/7/2018 |f 27/7/2018 |g 1 |l STACKS |m P11ALMBINA |r Y |s Y |t TESIS |u 11/3/2005 |1 STEM | ||
999 | |a TH145 UM 2004 IMRAY |w LC |c 2 |i A511405633 |d 27/7/2018 |e 5/12/2007 |f 27/7/2018 |g 1 |l STACKS |m P11ALMBINA |n 2 |r Y |s Y |t TESIS |u 11/3/2005 |1 STEM |