Value management as an aid to communication during design stage in Klang Valley construction industry /

Saved in:
Bibliographic Details
Main Author: Imran Ariff Yahya
Format: Thesis Book
Language:English
Published: 2004.
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 01336cam a2200289 a 4500
001 u696912
003 SIRSI
008 040701s2004 my a t 00 10 eng m
035 |a ADB-7330 
040 |a UMM  |d UMAB 
043 |a a-my--- 
090 |a TH145  |b UM 2004 Imray 
097 |a TH145  |b UM 2004 Imray 
100 0 0 |a Imran Ariff Yahya. 
245 1 0 |a Value management as an aid to communication during design stage in Klang Valley construction industry /  |c Imran Ariff Yahya. 
260 |c 2004. 
300 |a xiii, 211 leaves :  |b ill. ;  |c 30 cm. 
502 |a Dissertation (M.Sc. (Building)) -- Jabatan Ukur Bangunan, Fakulti Alam Bina, Universiti Malaya, 2004. 
650 0 |a Construction industry  |z Malaysia  |x Communication systems  |x Management. 
650 0 |a Business communication  |z Malaysia. 
650 0 |a Communication in management. 
710 2 0 |a Universiti Malaya.  |b Fakulti Alam Bina 
948 |a 01/07/2004  |b 19/08/2004 
596 |a 1 11 
999 |a TH145 UM 2004 IMRAY  |w LC  |c 1  |i A511570062  |d 10/2/2018  |e 10/2/2018  |f 18/4/2005  |g 1  |l STACKS  |m P01UTAMA  |n 7  |r Y  |s Y  |t TESIS  |u 17/12/2004 
999 |a TH145 UM 2004 IMRAY  |w LC  |c 1  |i A511226989  |d 27/7/2018  |f 27/7/2018  |g 1  |l STACKS  |m P11ALMBINA  |r Y  |s Y  |t TESIS  |u 11/3/2005  |1 STEM 
999 |a TH145 UM 2004 IMRAY  |w LC  |c 2  |i A511405633  |d 27/7/2018  |e 5/12/2007  |f 27/7/2018  |g 1  |l STACKS  |m P11ALMBINA  |n 2  |r Y  |s Y  |t TESIS  |u 11/3/2005  |1 STEM