Extensions of time in standard forms of construction contracts in Malaysia /
Saved in:
Main Author: | |
---|---|
Format: | Thesis Book |
Language: | English |
Published: |
2005.
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
LEADER | 01084cam a2200241 a 4500 | ||
---|---|---|---|
001 | u715654 | ||
003 | SIRSI | ||
008 | 051212s2005 my t 000 0 eng m | ||
040 | |a UMAB |d UMM | ||
090 | |a TH145 |b UM 2005 Lim | ||
097 | |a TH145 |b UM 2005 Lim | ||
100 | 1 | O | |a Lim, Chwee Chen |
245 | 1 | 0 | |a Extensions of time in standard forms of construction contracts in Malaysia / |c Lim Chwee Chen. |
260 | |c 2005. | ||
300 | |a xviii, 343 leaves : |b ill. ; |c 30 cm. | ||
502 | |a Dissertation (M.Sc. (Building)) -- Jabatan Ukur Bangunan, Fakulti Alam Bina, Universiti Malaya, 2005. | ||
504 | |a Bibliography: Leaves 340-343. | ||
650 | 0 | |a Time management |z Malaysia |x Design and construction. | |
650 | 0 | |a Construction contracts |z Malaysia |x Management. | |
710 | 2 | 0 | |a Universiti Malaya. |b Jabatan Ukur Bangunan. |
596 | |a 1 11 | ||
999 | |a TH145 UM 2005 LIM |w LC |c 1 |i A511827491 |d 16/11/2017 |e 16/11/2017 |f 20/12/2005 |g 1 |l STACKS |m P11ALMBINA |n 4 |r Y |s Y |t TESIS |u 20/12/2005 |1 STEM | ||
999 | |a TH145 UM 2005 LIM |w LC |c 1 |i A511827526 |d 25/3/2018 |e 25/3/2018 |f 22/8/2006 |g 1 |l STACKS |m P01UTAMA |n 1 |r Y |s Y |t TESIS |u 22/8/2006 |