Integrative mechanisms in the design process of building refurbishment projects /
Saved in:
Main Author: | |
---|---|
Format: | Thesis Book |
Language: | English |
Published: |
2008.
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
LEADER | 01119cam a2200277 a 4500 | ||
---|---|---|---|
001 | u758608 | ||
003 | SIRSI | ||
008 | 071127s2008 my v 000 0 eng m | ||
005 | 20071127161000.0 | ||
040 | |a UMM | ||
043 | |a a-my--- | ||
090 | |a NA2520 |b UTMP 2008 Azlsa | ||
100 | 0 | |a Azlan Shah Ali. | |
245 | 1 | 0 | |a Integrative mechanisms in the design process of building refurbishment projects / |c Azlan Shah bin Ali. |
260 | |c 2008. | ||
300 | |a xv, 395 leaves : |b ill. ; |c 30 cm. | ||
502 | |a Thesis (Ph.D) -- Jabatan Senibina, Fakulti Senibina, Perancangan dan Ukur, Universiti Teknologi MARA, 2008. | ||
504 | |a Bibliography: leaves 340-368. | ||
650 | 0 | |a Buildings |x Remodeling for other use |z Malaysia. | |
650 | 0 | |a Buildings |x Repair and construction |z Malaysia |x Case studies. | |
650 | 0 | |a Buildings |z Malaysia |x Design and construction. | |
650 | 0 | |a Construction industry |z Malaysia. | |
710 | 2 | 0 | |a Universiti Teknologi MARA. |b Fakulti Seni Bina, Perancangan & Ukur. |
596 | |a 1 | ||
900 | |a RM-ZA | ||
999 | |a NA2520 UTMP 2008 AZLSA |w LC |c 1 |i A513315530 |d 1/10/2009 |f 1/10/2009 |g 1 |l STACKS |m P01UTAMA |r Y |s Y |t TESIS |u 6/7/2009 |