Implementation of TPM in a roof tile factory for improving plant effectiveness /
Saved in:
Main Author: | |
---|---|
Format: | Thesis Book |
Language: | English |
Published: |
2008.
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
LEADER | 01210cam a2200289 a 4500 | ||
---|---|---|---|
001 | u766817 | ||
003 | SIRSI | ||
005 | 200903101325 | ||
008 | 090310s2008 my t 000 0 eng m | ||
040 | |a UMM | ||
043 | |a a-my-pe | ||
090 | |a TS176 |b UM 2008 May | ||
097 | |a TS176 |b UM 2008 May | ||
100 | 1 | |a Mayathevan, Maran. | |
245 | 1 | 0 | |a Implementation of TPM in a roof tile factory for improving plant effectiveness / |c Maran Mayathevan. |
260 | |c 2008. | ||
300 | |a ix, 89 leaves : |b ill. ; |c 30 cm. | ||
502 | |a Dissertation (M.Eng (Manuf.)) -- Jabatan Kejuruteraan Rekabentuk dan Pembuatan, Fakulti Kejuruteraan, Universiti Malaya, 2008. | ||
504 | |a Bibliography: leaves 82-83. | ||
650 | 0 | |a Total productive maintenance |z Perak |z Chemor. | |
650 | 0 | |a Tiles, Roofing |z Perak |z Chemor. | |
650 | 0 | |a Plant engineering |x Quality control. | |
710 | 2 | |a Universiti Malaya. |b Jabatan Kejuruteraan Rekabentuk dan Pembuatan. | |
900 | |a NAR-ZA | ||
596 | |a 1 7 | ||
999 | |a TS176 UM 2008 MAY |w LC |c 1 |i A513729485 |d 2/11/2018 |e 2/11/2018 |f 7/10/2009 |g 1 |l STACKS |m P01UTAMA |n 3 |r Y |s Y |t TESIS |u 1/10/2009 | ||
999 | |a TS176 UM 2008 MAY |w LC |c 1 |i A513399109 |d 3/11/2009 |f 3/11/2009 |g 1 |l STACKS |m P07JURUTER |r Y |s Y |t TESIS |u 3/11/2009 |