Tong, D. K. T. (2006). Effect of lot size on cycle time for semiconductor back-end manufacturing: A simulation approach.
Chicago Style (17th ed.) CitationTong, Douglas Kum Tien. Effect of Lot Size on Cycle Time for Semiconductor Back-end Manufacturing: A Simulation Approach. 2006.
MLA (8th ed.) CitationTong, Douglas Kum Tien. Effect of Lot Size on Cycle Time for Semiconductor Back-end Manufacturing: A Simulation Approach. 2006.
Warning: These citations may not always be 100% accurate.