APA引文

Tong, D. K. T. (2006). Effect of lot size on cycle time for semiconductor back-end manufacturing: A simulation approach.

Chicago Style (17th ed.) Citation

Tong, Douglas Kum Tien. Effect of Lot Size on Cycle Time for Semiconductor Back-end Manufacturing: A Simulation Approach. 2006.

MLA引文

Tong, Douglas Kum Tien. Effect of Lot Size on Cycle Time for Semiconductor Back-end Manufacturing: A Simulation Approach. 2006.

警告:这些引文格式不一定是100%准确.