Critical factors in project success : a study of public sector construction projects in Malaysia /
Saved in:
Main Author: | |
---|---|
Format: | Thesis Book |
Language: | English |
Published: |
2010.
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
LEADER | 01203cam a2200289 a 4500 | ||
---|---|---|---|
001 | u798000 | ||
003 | SIRSI | ||
005 | 201010141042 | ||
008 | 101014s2010 my a t 000 0 eng m | ||
040 | |a UMM |d UMAB | ||
043 | |a a-my--- | ||
090 | |a TH145 |b UMP 2010 Wanmwa | ||
097 | |a TH145 |b UMP 2010 Wanmwa | ||
100 | 0 | |a Wan Maimun Wan Abdullah. | |
245 | 1 | 0 | |a Critical factors in project success : |b a study of public sector construction projects in Malaysia / |c Wan Maimun binti Wan Abdullah. |
260 | |c 2010. | ||
300 | |a xvi, 322 leaves : |b ill. ; |c 30 cm. | ||
502 | |a Thesis (Ph.D) -- Jabatan Ukur Bangunan, Fakulti Alam Bina, Universiti Malaya, 2010. | ||
504 | |a Bibliography: leaves 264-299. | ||
650 | 0 | |a Construction industry |z Malaysia. | |
650 | 0 | |a Public works |x Management |z Malaysia. | |
650 | 0 | |a Project management |z Malaysia. | |
710 | 2 | |a Universiti Malaya. |b Jabatan Ukur Bahan. | |
900 | |a SJMK | ||
596 | |a 1 11 | ||
999 | |a TH145 UMP 2010 WANMWA |w LC |c 1 |i A514574935 |d 18/5/2022 |e 18/5/2022 |f 10/1/2011 |g 1 |l STACKS |m P01UTAMA |n 33 |r Y |s Y |t TESIS |u 7/1/2011 | ||
999 | |a TH145 UMP 2010 WANMWA |w LC |c 1 |i A514574630 |d 28/5/2019 |e 28/5/2019 |f 8/8/2018 |g 1 |l STACKS |m P11ALMBINA |n 4 |r Y |s Y |t TESIS |u 22/8/2011 |