Implementation of reliability centered maintenance for productivity enhancement : a case study in a tyre manufacturing company /
Saved in:
Main Author: | |
---|---|
Format: | Thesis Book |
Language: | English |
Published: |
2011.
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
LEADER | 01259cam a2200301 a 4500 | ||
---|---|---|---|
001 | u837155 | ||
003 | SIRSI | ||
005 | 201108191527 | ||
008 | 110819s2011 my a t 000 0 eng m | ||
040 | |a UMM |u MJ | ||
090 | |a TS176 |b UM 2011 Hem | ||
097 | |a TS176 |b UM 2011 Hem | ||
100 | 0 | |a Hema Vinodrai. | |
245 | 1 | 0 | |a Implementation of reliability centered maintenance for productivity enhancement : |b a case study in a tyre manufacturing company / |c Hema Vinodrai. |
260 | |c 2011. | ||
300 | |a 102 leaves : |b ill. ; |c 30 cm. | ||
502 | |a Dissertation (M.Eng.) -- Jabatan Kejuruteraan Rekabentuk dan Pembuatan, Fakulti Kejuruteraan, Universiti Malaya, 2011. | ||
504 | |a Bibliography: leaves 82-87. | ||
650 | 0 | |a Reliability (Engineering). | |
650 | 0 | |a Maintainability (Engineering). | |
650 | 0 | |a Production engineering. | |
650 | 0 | |a Manufacturing processes. | |
650 | 0 | |a Tire industry. | |
710 | 2 | |a Universiti Malaya. |b Jabatan Kejuruteraan Rekabentuk dan Pembuatan. | |
900 | |a NHS | ||
596 | |a 1 7 | ||
999 | |a TS176 UM 2011 HEM |w LC |c 1 |i A514827356 |d 4/3/2014 |e 4/3/2014 |f 29/6/2012 |g 1 |l STACKS |m P01UTAMA |n 1 |r Y |s Y |t TESIS |u 29/6/2012 | ||
999 | |a TS176 UM 2011 HEM |w LC |c 1 |i A514901958 |d 17/7/2013 |f 17/7/2013 |g 1 |l STACKS |m P07JURUTER |r Y |s Y |t TESIS |u 17/7/2013 |