A study of yield quantity discrepancy reduction in semi-conductor back-end process /
Saved in:
主要作者: | Allina Abdullah |
---|---|
格式: | Thesis 圖書 |
語言: | English |
出版: |
2011.
|
主題: | |
在線閱讀: | http://studentsrepo.um.edu.my/id/eprint/3134 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
相似書籍
-
Determining the relationship between cost of control and project management success in building construction /
由: Al-Tmeemy, Samiaah M. Hassen
出版: (2011) -
Survey on the adoption and implementation of cost of quality (COQ) reporting among manufacturing organizations in Malaysia /
由: Murugan Rasamanie
出版: (2010) -
Application of cost significance technique to time and cost control of construction projects /
由: Sin, Wai Meng
出版: (1995) -
Influence of design & tender processes towards cost overrun in Malaysia's building services projects /
由: Boudeville, Jacquelyne Anne
出版: (2022) -
Design science research as an approach to develop conceptual solutions for improving cost management in construction /
由: Mahanim Hanid
出版: (2014)