Factors affecting time performance of refurbishment projects in Singapore /
Saved in:
Main Author: | |
---|---|
Format: | Thesis Book |
Language: | English |
Published: |
2012.
|
Subjects: | |
Online Access: | http://studentsrepo.um.edu.my/id/eprint/3591 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
LEADER | 01151cam a2200289 a 4500 | ||
---|---|---|---|
001 | u858771 | ||
003 | SIRSI | ||
005 | 201206190942 | ||
008 | 120619s2012 my a t 000 0 eng m | ||
040 | |a UMAB | ||
043 | |a a-si--- | ||
097 | |a TH145 |b UM 2012 Che | ||
100 | 1 | |a Chew, Lee Fuan. | |
245 | 1 | 0 | |a Factors affecting time performance of refurbishment projects in Singapore / |c Chew Lee Fuan. |
260 | |c 2012. | ||
300 | |a x, 160 [38] leaves : |b ill. ; |c 30 cm. | ||
502 | |a Dissertation (M.Sc. (Building)) -- Jabatan Ukur Bangunan, Fakulti Alam Bina, Universiti Malaya, 2012. | ||
504 | |a Bibliography: leaves 145-160. | ||
530 | |a Also issued in CD. | ||
650 | 0 | |a Buildings |x Repair and reconstruction |x Cost effectiveness |z Singapore. | |
650 | 0 | |a Buildings |x Remodeling for other use |z Singapore. | |
650 | 0 | |a Construction industry |x Labor productivity |z Singapore. | |
710 | 2 | 0 | |a Universiti Malaya. |b Jabatan Ukur Bangunan. |
856 | 4 | 1 | |u http://studentsrepo.um.edu.my/id/eprint/3591 |
900 | |a ZA | ||
596 | |a 11 | ||
999 | |a TH145 UM 2012 CHE |w LC |c 1 |i A515049499 |d 8/3/2019 |e 8/3/2019 |f 18/1/2013 |g 1 |l STACKS |m P11ALMBINA |n 2 |r Y |s Y |t TESIS |u 17/1/2013 |