Factors affecting time performance of refurbishment projects in Singapore /

Saved in:
Bibliographic Details
Main Author: Chew, Lee Fuan
Format: Thesis Book
Language:English
Published: 2012.
Subjects:
Online Access:http://studentsrepo.um.edu.my/id/eprint/3591
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 01151cam a2200289 a 4500
001 u858771
003 SIRSI
005 201206190942
008 120619s2012 my a t 000 0 eng m
040 |a UMAB 
043 |a a-si--- 
097 |a TH145  |b UM 2012 Che 
100 1 |a Chew, Lee Fuan. 
245 1 0 |a Factors affecting time performance of refurbishment projects in Singapore /  |c Chew Lee Fuan. 
260 |c 2012. 
300 |a x, 160 [38] leaves :  |b ill. ;  |c 30 cm. 
502 |a Dissertation (M.Sc. (Building)) -- Jabatan Ukur Bangunan, Fakulti Alam Bina, Universiti Malaya, 2012. 
504 |a Bibliography: leaves 145-160. 
530 |a Also issued in CD. 
650 0 |a Buildings  |x Repair and reconstruction  |x Cost effectiveness  |z Singapore. 
650 0 |a Buildings  |x Remodeling for other use  |z Singapore. 
650 0 |a Construction industry  |x Labor productivity  |z Singapore. 
710 2 0 |a Universiti Malaya.  |b Jabatan Ukur Bangunan. 
856 4 1 |u http://studentsrepo.um.edu.my/id/eprint/3591 
900 |a ZA 
596 |a 11 
999 |a TH145 UM 2012 CHE  |w LC  |c 1  |i A515049499  |d 8/3/2019  |e 8/3/2019  |f 18/1/2013  |g 1  |l STACKS  |m P11ALMBINA  |n 2  |r Y  |s Y  |t TESIS  |u 17/1/2013