The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia /

Saved in:
Bibliographic Details
Main Author: Mohd Azrai Azman
Format: Thesis Book
Language:English
Published: 2012.
Subjects:
Online Access:http://studentsrepo.um.edu.my/id/eprint/3587
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 01209cam a2200289 a 4500
001 u860171
003 SIRSI
005 201207100848
008 120710s2012 my a t 000 0 eng m
040 |a UMAB  |d AUM  |e rda 
043 |a a-my--- 
097 |a TH145  |b UM 2012 Mohaa 
100 0 |a Mohd Azrai Azman. 
245 1 4 |a The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia /  |c Mohd Azrai bin Azman. 
260 |c 2012. 
300 |a xvi, 301 leaves :  |b ill. ;  |c 30 cm. 
502 |a Dissertation (M.Sc. (Building)) -- Jabatan Ukur Bahan, Fakulti Alam Bina, Universiti Malaya, 2012. 
504 |a Bibliography: leaves 267-286. 
530 |a Also issued in CD. 
650 0 |a Public buildings  |x Estimates  |z Malaysia. 
650 0 |a Public works  |z Malaysia  |x Design and construction  |x Costs. 
710 2 0 |a Universiti Malaya.  |b Jabatan Ukur Bahan. 
856 4 1 |u http://studentsrepo.um.edu.my/id/eprint/3587 
900 |a MZAR-ZA 
596 |a 11 25 
999 |a TH145 UM 2012 MOHAA  |w LC  |c 1  |i A515049689  |d 3/3/2015  |f 3/3/2015  |g 1  |l STACKS  |m P11ALMBINA  |r Y  |s Y  |t TESIS  |u 3/3/2015 
999 |a TH145 UM 2012 MOHAA  |w LC  |c 1  |i A515049658  |d 22/10/2018  |l STACKS  |m P25UMARCHI  |q 1  |r Y  |s Y  |t CD  |u 22/10/2018  |1 STEM