The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia /
Saved in:
主要作者: | Mohd Azrai Azman |
---|---|
格式: | Thesis 圖書 |
語言: | English |
出版: |
2012.
|
主題: | |
在線閱讀: | http://studentsrepo.um.edu.my/id/eprint/3587 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
相似書籍
-
Accuracy in design stage cost estimating /
由: Cheong, Pak Foong
出版: (1991) -
Design and cost management in the project process /
由: Lau, William Thiam You
出版: (1991) -
Standard guidelines for bill of quantities customised for building conservation works : the Malaysian context /
由: Lim, Yoke Mui
出版: (2017) -
Probabilistic elemental cost modelling for building construction in Malaysia /
由: Ng, Chee Hock
出版: (2007) -
Case studies on cost overrun in commercial development projects in the Klang Valley /
由: Oo, Boon Khim
出版: (2019)