Verification of overcurrent and earthfault coordination setting in building complex /
Saved in:
Main Author: | |
---|---|
Format: | Thesis Book |
Language: | English |
Published: |
2012.
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
LEADER | 01303cam a2200301 a 4500 | ||
---|---|---|---|
001 | u865426 | ||
003 | SIRSI | ||
005 | 201209271730 | ||
008 | 120927s2012 my a t 000 0 eng m | ||
040 | |a UMM |d UMJ | ||
090 | |a TK7 |b UM 2012 Mohnar | ||
097 | |a TK7 |b UM 2012 Mohnar | ||
100 | 0 | |a Mohamad Norshahrani Abdul Rahim. | |
245 | 1 | 0 | |a Verification of overcurrent and earthfault coordination setting in building complex / |c Mohamad Norshahrani bin Abdul Rahim. |
260 | |c 2012. | ||
300 | |a xv, 78 [11] leaves : |b ill. ; |c 30 cm. | ||
502 | |a Dissertaion (M.Eng. (Electr.Energy Power Syst.)) -- Jabatan Kejuruteraan Elektrik, Fakulti Kejuruteraan, Universiti Malaya, 2012. | ||
504 | |a Bibliography: leaves 75-76. | ||
596 | |a 1 7 | ||
650 | 0 | |a Electric power systems |x Protection. | |
650 | 0 | |a Protective relays. | |
650 | 0 | |a Electric relays. | |
650 | 0 | |a Electric fault location. | |
710 | 2 | |a Universiti Malaya. |b Jabatan Kejuruteraan Elektrik. | |
900 | |a US-ZA | ||
999 | |a TK7 UM 2012 MOHNAR |w LC |c 1 |i A515288304 |d 27/2/2013 |f 27/2/2013 |g 1 |l STACKS |m P01UTAMA |r Y |s Y |t TESIS |u 25/2/2013 | ||
999 | |a TK7 UM 2012 MOHNAR |w LC |c 1 |i A515658058 |d 6/8/2013 |f 6/8/2013 |g 1 |l STACKS |m P07JURUTER |r Y |s Y |t TESIS |u 5/8/2013 | ||
999 | |a TK7 UM 2012 MOHNAR |w LC |c 2 |i A515658129 |l COUNTER |m P07JURUTER |r Y |s Y |t CD |u 5/8/2013 |