A conceptual model to improve building commissioning in construction projects : case studies of a public institution of higher learning in Malaysia /

Saved in:
Bibliographic Details
Main Author: Kho, Mei Ye
Format: Thesis Book
Language:English
Published: 2013.
Subjects:
Online Access:http://studentsrepo.um.edu.my/id/eprint/5593
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 01355cam a2200325 a 4500
001 u886220
003 SIRSI
005 201308191552
008 130819s2013 my a t 000 0 eng m
040 |a UMM  |d UMAB 
043 |a a-my--- 
090 |a TH145  |b UMP 2013 Kho 
090 |a AT-ZA 
097 |a TH145  |b UMP 2013 Kho 
100 1 |a Kho, Mei Ye. 
245 1 2 |a A conceptual model to improve building commissioning in construction projects :  |b case studies of a public institution of higher learning in Malaysia /  |c Kho Mei Ye. 
260 |c 2013. 
300 |a xvii, 342 leaves :  |b ill. ;  |c 30 cm. 
502 |a Thesis (Ph.D) -- Jabatan Ukur Bahan, Fakulti Alam Bina, Universiti Malaya, 2013. 
504 |a Bibliography: leaves 321-338. 
530 |a Issued also in CD. 
650 0 |a Building commissioning  |z Malaysia 
650 0 |a Building commissioning  |v Case studies. 
650 0 |a Construction industry  |z Malaysia  |x Management. 
650 0 |a Construction projects  |z Malaysia. 
710 2 |a Universiti Malaya.  |b Jabatan Ukur Bahan. 
856 4 1 |u http://studentsrepo.um.edu.my/id/eprint/5593 
596 |a 1 11 
999 |a TH145 UMP 2013 KHO  |w LC  |c 1  |i A515670266  |d 9/10/2018  |e 9/10/2018  |f 8/5/2014  |g 2  |l STACKS  |m P01UTAMA  |n 4  |r Y  |s Y  |t TESIS  |u 15/4/2014 
999 |a TH145 UMP 2013 KHO  |w LC  |c 1  |i A515665867  |d 8/5/2014  |f 8/5/2014  |g 1  |l STACKS  |m P11ALMBINA  |r Y  |s Y  |t TESIS  |u 8/5/2014