An Information Technology Infrastructure Flexibility (ITIF) preliminary model for the construction industry /
Saved in:
Main Author: | |
---|---|
Format: | Thesis Book |
Language: | English |
Published: |
2013.
|
Subjects: | |
Online Access: | http://studentsrepo.um.edu.my/id/eprint/5528 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
LEADER | 01388cam a2200337 i 4500 | ||
---|---|---|---|
001 | u886836 | ||
003 | SIRSI | ||
005 | 201308281656 | ||
008 | 130828s2013 my a t 000 0 eng m | ||
040 | |a UMM |d UMAB |e rda | ||
090 | |a TH145 |b UMP 2013 Nurz | ||
097 | |a TH145 |b UMP 2013 Nurz | ||
100 | 0 | |a Nurshuhada Zainon, |e author. | |
245 | 1 | 3 | |a An Information Technology Infrastructure Flexibility (ITIF) preliminary model for the construction industry / |c Nurshuhada Zainon |
264 | 1 | |c 2013. | |
264 | 4 | |c 2013. | |
300 | |a xvi, 294 leaves : |b illustrations ; |c 30 cm. | ||
336 | |a text |2 rdacontent | ||
337 | |a unmediated |2 rdamedia | ||
338 | |a volume |2 rdacarrier | ||
502 | |b Ph.D |c Jabatan Ukur Bahan, Fakulti Alam Bina, Universiti Malaya |d 2013. | ||
504 | |a Bibliography: leaves 252-270 | ||
530 | |a Issued also in CD. | ||
650 | 0 | |a Construction industry |x Information technology. | |
650 | 0 | |a Information technology |x Industrial applications. | |
710 | 2 | |a Universiti Malaya. |b Jabatan Ukur Bahan, |e degree granting institution. | |
856 | 4 | 1 | |u http://studentsrepo.um.edu.my/id/eprint/5528 |
900 | |a HA-ZA | ||
596 | |a 1 11 | ||
999 | |a TH145 UMP 2013 NURZ |w LC |c 2 |i A515704923 |d 3/3/2015 |f 3/3/2015 |g 1 |l STACKS |m P11ALMBINA |r Y |s Y |t TESIS |u 3/3/2015 | ||
999 | |a TH145 UMP 2013 NURZ |w LC |c 1 |i A515669254 |d 26/2/2019 |e 26/2/2019 |f 9/7/2014 |g 1 |l STACKS |m P01UTAMA |n 1 |r Y |s Y |t TESIS |u 8/7/2014 |