An Information Technology Infrastructure Flexibility (ITIF) preliminary model for the construction industry /

Saved in:
Bibliographic Details
Main Author: Nurshuhada Zainon (Author)
Format: Thesis Book
Language:English
Published: 2013.
Subjects:
Online Access:http://studentsrepo.um.edu.my/id/eprint/5528
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 01388cam a2200337 i 4500
001 u886836
003 SIRSI
005 201308281656
008 130828s2013 my a t 000 0 eng m
040 |a UMM  |d UMAB  |e rda 
090 |a TH145  |b UMP 2013 Nurz 
097 |a TH145  |b UMP 2013 Nurz 
100 0 |a Nurshuhada Zainon,  |e author. 
245 1 3 |a An Information Technology Infrastructure Flexibility (ITIF) preliminary model for the construction industry /  |c Nurshuhada Zainon 
264 1 |c 2013. 
264 4 |c  2013. 
300 |a xvi, 294 leaves :  |b illustrations ;  |c 30 cm. 
336 |a text  |2 rdacontent 
337 |a unmediated  |2 rdamedia 
338 |a volume  |2 rdacarrier 
502 |b Ph.D  |c Jabatan Ukur Bahan, Fakulti Alam Bina, Universiti Malaya  |d 2013. 
504 |a Bibliography: leaves 252-270 
530 |a Issued also in CD. 
650 0 |a Construction industry  |x Information technology. 
650 0 |a Information technology  |x Industrial applications. 
710 2 |a Universiti Malaya.  |b Jabatan Ukur Bahan,  |e degree granting institution. 
856 4 1 |u http://studentsrepo.um.edu.my/id/eprint/5528 
900 |a HA-ZA 
596 |a 1 11 
999 |a TH145 UMP 2013 NURZ  |w LC  |c 2  |i A515704923  |d 3/3/2015  |f 3/3/2015  |g 1  |l STACKS  |m P11ALMBINA  |r Y  |s Y  |t TESIS  |u 3/3/2015 
999 |a TH145 UMP 2013 NURZ  |w LC  |c 1  |i A515669254  |d 26/2/2019  |e 26/2/2019  |f 9/7/2014  |g 1  |l STACKS  |m P01UTAMA  |n 1  |r Y  |s Y  |t TESIS  |u 8/7/2014