A constraint-programming approach to scheduling resource-limited projects /

Saved in:
Bibliographic Details
Main Author: Tay, Danny Poh Huat
Format: Thesis Book
Language:English
Published: 1989.
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 00798cam a2200241 a 4500
001 u93627
003 SIRSI
008 910607s1989 si v 00 1 eng m
035 |a AAK-2261 
040 |a UMM 
090 |a TH438.4  |b Tay 
100 1 0 |a Tay, Danny Poh Huat. 
245 1 2 |a A constraint-programming approach to scheduling resource-limited projects /  |c Danny Tay Poh Huat. 
260 1 |c 1989. 
300 |a v, 128 leaves ;  |c 30 cm. 
500 |a Photocopy. 
502 |a Dissertation (M.Sc.) -- National University of Singapore, 1989. 
504 |a Includes bibliographical references. 
650 0 |a Production scheduling. 
650 0 |a Construction industry  |x Management. 
948 |a 13/08/1991  |b 27/08/2002 
596 |a 1 
999 |a TH438.4 TAY  |w LC  |c 1  |i A010892001  |l STACKS  |m P01UTAMA  |r Y  |s Y  |t TESIS  |u 30/1/1992