A constraint-programming approach to scheduling resource-limited projects /
Saved in:
Main Author: | |
---|---|
Format: | Thesis Book |
Language: | English |
Published: |
1989.
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
LEADER | 00798cam a2200241 a 4500 | ||
---|---|---|---|
001 | u93627 | ||
003 | SIRSI | ||
008 | 910607s1989 si v 00 1 eng m | ||
035 | |a AAK-2261 | ||
040 | |a UMM | ||
090 | |a TH438.4 |b Tay | ||
100 | 1 | 0 | |a Tay, Danny Poh Huat. |
245 | 1 | 2 | |a A constraint-programming approach to scheduling resource-limited projects / |c Danny Tay Poh Huat. |
260 | 1 | |c 1989. | |
300 | |a v, 128 leaves ; |c 30 cm. | ||
500 | |a Photocopy. | ||
502 | |a Dissertation (M.Sc.) -- National University of Singapore, 1989. | ||
504 | |a Includes bibliographical references. | ||
650 | 0 | |a Production scheduling. | |
650 | 0 | |a Construction industry |x Management. | |
948 | |a 13/08/1991 |b 27/08/2002 | ||
596 | |a 1 | ||
999 | |a TH438.4 TAY |w LC |c 1 |i A010892001 |l STACKS |m P01UTAMA |r Y |s Y |t TESIS |u 30/1/1992 |