Earned value management system in manufacturing industry /

Saved in:
Bibliographic Details
Main Author: Haghighi, Fatemeh Rasooli (Author)
Format: Thesis Book
Language:English
Published: 2013.
Subjects:
Online Access:http://studentsrepo.um.edu.my/id/eprint/8173.
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 01458cam a2200313 i 4500
001 u980145
003 SIRSI
005 201311271520
008 131127s2013 my a t 000 0 eng m
040 |a UMM  |d UMJ  |d AUM  |e rda 
090 |a TJ7  |b UM 2013 Hag 
097 |a TJ7  |b UM 2013 Hag 
100 1 |a Haghighi, Fatemeh Rasooli,  |e author. 
245 1 0 |a Earned value management system in manufacturing industry /  |c Fatemeh Rasooli Haghighi. 
264 1 |c 2013. 
264 4 |c  2013. 
300 |a xiii, 71 leaves, 5 unnumbered leaves :  |b illustrations ;  |c 30 cm. 
502 |b M.Eng.  |c Jabatan Kejuruteraan Mekanik, Fakulti Kejuruteraan, Universiti Malaya  |d 2013. 
504 |a Bibliography: leaves 65-69. 
650 0 |a Project management. 
650 0 |a Project management  |x Cost effectiveness. 
650 0 |a Manufacturing industries  |x Management. 
650 0 |a Manufacturing processes  |x Cost effectiveness. 
710 2 |a Universiti Malaya.  |b Jabatan Kejuruteraan Mekanik,  |e degree granting institution. 
856 4 1 |u http://studentsrepo.um.edu.my/id/eprint/8173. 
596 |a 1 7 25 
999 |a TJ7 UM 2013 HAG  |w LC  |c 1  |i A515772384  |d 19/11/2014  |f 19/11/2014  |g 1  |l STACKS  |m P07JURUTER  |r N  |s Y  |t TESIS  |u 18/11/2014  |1 STEM 
999 |a TJ7 UM 2013 HAG  |w LC  |c 1  |i A515700688  |d 24/2/2015  |f 24/2/2015  |g 1  |l STACKS  |m P01UTAMA  |r Y  |s Y  |t TESIS  |u 13/2/2015  |1 STEM 
999 |a TJ7 UM 2013 HAG  |w LC  |c 1  |i A516079863  |d 19/11/2014  |f 19/11/2014  |g 1  |l STACKS  |m P25UMARCHI  |r N  |s Y  |t CD  |u 18/11/2014  |1 STEM  |o .STAFF. MST-CD9067