An efficiency improvement of flexible flow shop scheduling problem in automotive part company /

Saved in:
Bibliographic Details
Main Author: Fangrit, Waraporn (Author)
Format: Thesis Book
Language:English
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 01337cam a2200313 i 4500
001 u999186
003 SIRSI
005 201407111635
008 140711s2014 my a t 000 0 eng m
040 |a UMM  |d UMJ  |e rda 
090 |a TS176  |b UM 2014 Fan 
097 |a TS176  |b UM 2014 Fan 
100 1 |a Fangrit, Waraporn,  |e author 
245 1 2 |a An efficiency improvement of flexible flow shop scheduling problem in automotive part company /  |c Waraporn Fangrit. 
264 1 |c 2014 
264 4 |c  2014 
300 |a xi, 93 leaves :  |b illustrations ;  |c 30 cm 
336 |a text  |2 rdacontent 
337 |a unmediated  |2 rdamedia 
338 |a volume  |2 rdacarrier 
502 |b M.Eng.(Manuf.)  |c Jabatan Kejuruteraan Mekanik, Fakulti Kejuruteraan, Universiti Malaya  |d 2014. 
504 |a Bibliography: leaves 78-81. 
650 0 |a Robotics  |x Technological innovations. 
710 2 |a Universiti Malaya.  |b Jabatan Kejuruteraan Mekanik,  |e degree granting institution 
900 |a MZAR-ZA 
596 |a 1 7 
999 |a TS176 UM 2014 FAN  |w LC  |c 1  |i A515967275  |d 21/4/2015  |f 21/4/2015  |g 2  |l STACKS  |m P07JURUTER  |r N  |s Y  |t TESIS  |u 26/9/2014 
999 |a TS176 UM 2014 FAN  |w LC  |c 2  |i A515962595  |d 26/9/2014  |f 26/9/2014  |g 1  |l COUNTER  |m P07JURUTER  |r N  |s Y  |t CD  |u 26/9/2014 
999 |a TS176 UM 2014 FAN  |w LC  |c 1  |i A515926253  |d 25/8/2015  |f 25/8/2015  |g 1  |l STACKS  |m P01UTAMA  |r Y  |s Y  |t TESIS  |u 21/8/2015  |1 STEM