-
1by Lim, Andy Say Wai“...All construction employers in Malaysia are required to have an injury reporting system that ensures...”
Published 2007
Get full text
Thesis -
2
-
3by Jatarona, Nurul Alifah“... be observed in the Annual National Audit Reports. This study intends to propose a framework of Poor...”
Published 2018
Get full text
Thesis -
4by Ibrahim, Ramzi“... are to identify the important elements of project reporting towards establishment of communication framework...”
Published 2014
Get full text
Thesis -
5by Esmaeeli, Hamed“... of mortalities often occur. This report investigates the modelling and implementation of a coordination system...”
Published 2010
Get full text
Thesis -
6by Mahmoud Farouq, Murtala“... the problems on road defect reporting system in KARMA. The study is conducted through questionnaires...”
Published 2015
Get full text
Thesis -
7by Mansur, Shaiful Amri“... and schedule compression methods for reporting productivity status and evaluating project performance...”
Published 2004
Get full text
Thesis -
8by Tan, Joo Ee“... reliable method for assessing old structures. The project report presents detailed investigation findings...”
Published 2016
Get full text
Thesis -
9
-
10by Abdul Rani, Onn“... involved obtaining data from contract document, bill of quantity, consultant reports and operations report...”
Published 2007
Get full text
Thesis -
11by Mohd. Noor, Mohd. Nasir“... construction especially during construction stage. These problems have been identified in this report...”
Published 2010
Get full text
Thesis -
12by Ibrahim, Mohamud Abdirahman“...This project report is devoted to the modeling of the impact behavior of laminated composite plates...”
Published 2013
Get full text
Thesis -
13by Hussein, Ahmed Abdulameer“... also were compared with those reported in ITE Trip Generation Manual 9th edition (2012) and Malaysia...”
Published 2013
Get full text
Thesis -
14by Othman, Ahmad Mazlan“... and Normal Concrete with the focus on throw distance, shape and size of concrete fragments. This report...”
Published 2008
Get full text
Thesis -
15by Lee, Sid Hwa“...There are reported roof failure due to uplifting of the roof structures or roof sheeting during...”
Published 2008
Get full text
Thesis -
16
-
17by Lok, Siew Chin“... used to control critically. As for the progress reports, majority prefer to keep the records on paper...”
Published 2014
Get full text
Thesis -
18
-
19by Mazlan, Ain Naadia“... Security Organisation (SOCSO) reports on the workers’ noise exposure, area noise, chemical and heat...”
Published 2017
Get full text
Thesis -
20