-
1
-
2
-
3by Suhaimi, Aminuddin“... investigated with three different arrangements of shear reinforcement; vertical link, inclined link...”
Published 2015
Get full text
Thesis -
4by Wong, Keng Lian“... is due to uncertainties arise in the entire project life cycle. Hence, risk management has been...”
Published 2000
Thesis -
5by Koothayan, Yugabalan“... with optimum design of connecting links frequently found in a single point mooring system, based...”
Published 2005
Get full text
Thesis -
6by Buhari, Suffian“... link protruded into the concrete slab to act as the shear connector. The moment and shear capacities...”
Published 2018
Get full text
Thesis -
7by Chung, Hui Hui“..., including falling from height and falling of materials. The key of dealing with project safety and risk...”
Published 2011
Get full text
Thesis -
8
-
9
-
10by Sarpin, Norliana“..., therefore an effective risk assessment process of hazards has the potential to overcome the problem...”
Published 2006
Get full text
Thesis -
11
-
12
-
13by Hermanto, Budi“...Every project has its own risks. One of the common risk during project execution is the risk...”
Published 2010
Get full text
Thesis -
14
-
15
-
16
-
17
-
18by Mohamad, Rosli“...This study was conducted to assess the risk of health hazards of exposure to hazardous waste...”
Published 2011
Get full text
Thesis -
19
-
20