-
1by Lee, Siak Kuan“... recorded in Perak to date. A total of 128 soil samples collected were analyzed for the activities...”
Published 2007
Get full text
Thesis -
2by Al-Kawaz, Ameer Sabah Noori“... factories at Kinta Valley, Perak, Malaysia were measured. Nine samples were collected analyzed...”
Published 2014
Get full text
Thesis -
3
-
4
-
5by Nojumuddin, Nur Syereena“..., Perak, Kedah, Kelantan and Pahang are 8 hours, 6 hours, 5 hours, 8 hours, 9 hours and 8 hours...”
Published 2017
Get full text
Thesis -
6by Mansoor, Taha Yaseen“... plant at Kinta Valley, Perak. The gamma dose rates and activity concentrations of 238U, 232Th and 40K...”
Published 2014
Get full text
Thesis -
7by Othman, Anuar“... mine in Perak. The pond is the recycle water system of the tin ore processing plant and has pH values...”
Published 2017
Get full text
Thesis