Feasibility study of four dimension (4D) virtual construction tool to mitigate delays during construction /
The problem of delays in the construction industry is a global phenomenon and the construction industry in Malaysia is no exception. In the current day context, despite significant benefits in terms of time and cost savings gained through the systematic use of 4D technologies on construction project...
محفوظ في:
المؤلف الرئيسي: | Julia Mohd Nor |
---|---|
التنسيق: | أطروحة |
اللغة: | English |
منشور في: |
Kuala Lumpur:
Kulliyyah of Architecture abd Environmental Design, International Islamic University Malaysia,
2011
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://studentrepo.iium.edu.my/handle/123456789/2650 |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
Analysis of the intial public offer of four companies in the construction industry in Singapore /
بواسطة: Lee, Cher Ling
منشور في: (1986) -
A study of contractor's attitude towards integration of M & E works in construction projects /
بواسطة: Lee, Julia Yew Fong
منشور في: (1998) -
Level of constructability and design management in the Singapore construction industry /
بواسطة: Lim, Kon Wen
منشور في: (1998) -
Export of construction services /
بواسطة: Quak, Ser Khoon
منشور في: (1991) -
Construction industry : study of the retrofitting sector /
بواسطة: Chee, Miew Ling
منشور في: (1992)