Industrialized building system : the government's effort and contractors' response /
The main problem for construction industry in Malaysia is the late delivery of projects. Due to late delivery of projects, the Government has introduced various strategies to ensure the delivery of projects right on time, as stipulated in the construction contracts. For projects worth more than RM10...
محفوظ في:
المؤلف الرئيسي: | Ahmad Firdaus bin Baharuddin |
---|---|
التنسيق: | أطروحة |
اللغة: | English |
منشور في: |
Kuala Lumpur :
Kulliyyah of Architecture & Environmental Design, International Islamic University Malaysia,
2015
|
الموضوعات: | |
الوصول للمادة أونلاين: | Click here to view 1st 24 pages of the thesis. Members can view fulltext at the specified PCs in the library. |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
Industrialised Building System (IBS) adoption in Iran, perception of users and industry participants /
بواسطة: Ashrafi, Mohammad Sharif
منشور في: (2017) -
The implementation of Industrialised Building System (IBS) in Malaysia from architects' and engineers' perspective /
بواسطة: Qureshi, Sara Latif
منشور في: (2019) -
Contractor acceptance on industrialized building system (IBS) in construction industry / Muhammad Aizat Ismail
بواسطة: Ismail, Muhammad Aizat
منشور في: (2012) -
Improving contractors’ practices of Industrialised Building System (IBS) implementation in construction industry
بواسطة: Ali Al-Shami, Mohammed Hamid
منشور في: (2019) -
Nominated sub-contractors and suppliers in the Malaysian building industry /
بواسطة: Kalavathy Maruthavanar
منشور في: (1995)