Minimising total tardiness for hybrid flowshop with batch-discrete processors, setup times, and distinct job sizes
This research addresses a complex hybrid flowshop (HFS) scheduling problem confronted in a real industrial environment in a manufacturing plant which provides electro-plating services to the electronic and semiconductor industries. It is modelled as a four-stage hybrid flowshop problem with multipl...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Published: |
2013
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|