Minimising total tardiness for hybrid flowshop with batch-discrete processors, setup times, and distinct job sizes
This research addresses a complex hybrid flowshop (HFS) scheduling problem confronted in a real industrial environment in a manufacturing plant which provides electro-plating services to the electronic and semiconductor industries. It is modelled as a four-stage hybrid flowshop problem with multipl...
Saved in:
Main Author: | Teo, Siew Chein |
---|---|
Format: | Thesis |
Published: |
2013
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Hierarchical Production Planning, Framework For The Batch Production Environment With Setup Time And Setup Cost Restrictions
by: Teo , Siew Chein
Published: (2005) -
Minimizing makespan and total weighted tardiness for job shop scheduling problem using shifting bottleneck heuristic
by: Teoh, Lay Eng
Published: (2005) -
Total quality control to minimise building maintenance : the HDB's experience /
by: Lee, Pheck Yan
Published: (1992) -
Bottleneck-based heuristic for permutation flowshop scheduling
by: Isa, Noor Amira
Published: (2017) -
Dynamic weighted idle time heuristic for flowshop scheduling
by: Zainudin, Amira Syuhada
Published: (2017)