Work study on industrial production in x-member assembly SRM 24 (welding) at Tracoma Sdn. Bhd. / Wan Mohammad Fadhli Wan Hapandi
Presently, there are many manufacturing companies seeking improvement to their assembly operation in order to reduce the cycle time and increase productivity. To achieve the desired target, all the inefficient elements must be identified and eliminated in order to reduce cycle time. This thesis an...
Saved in:
Main Author: | Wan Hapandi, Wan Mohammad Fadhli |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2009
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/38945/1/38945.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Properties of oriented strand board from petai belalang (Leucaena leucocephala) wood / Wan Mohd Nazri Wan Abdul Rahman
by: Wan Abdul Rahman, Wan Mohd Nazri
Published: (2009) -
Inspection of similar welding of aluminium alloy 5083 and stainless steel 304L using advance ultrasonic testing / Mohamad Izad Asyaari Mohd Yasin
by: Mohd Yasin, Mohamad Izad Asyaari
Published: (2012) -
Influence of ffb grade in th efficiency of palm oil mill processing plant study on oer for loose fruit / Aimi Samsudin
by: Samsudin, Aimi
Published: (2010) -
Properties of HDF for flooring production: density, edge density, internal bonding, thickness swelling & moisture content / Faris Triputra Zahari
by: Zahari, Faris Triputra
Published: (2023) -
Development and characterization of adhesives from soda bamboo lignin / Syaiful Osman
by: Osman, Syaiful
Published: (2018)