Requirements engineering of e-complaint management system for Teluk Pulai Primary School, Klang Selangor using iterative development / Nor Amarlia Ab Wahab

The ability to manage customer's complaints well is very important to any organization. It helps to maintain a healthy relationship between the organization and its customer and keeps the customer satisfied. Teluk Pulai Primary School in Klang is currently experiencing problems in managing comp...

Full description

Saved in:
Bibliographic Details
Main Author: Ab Wahab, Nor Amarlia
Format: Thesis
Language:English
Published: 2015
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/41591/1/41591.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-uitm-ir.41591
record_format uketd_dc
spelling my-uitm-ir.415912021-02-16T10:33:14Z Requirements engineering of e-complaint management system for Teluk Pulai Primary School, Klang Selangor using iterative development / Nor Amarlia Ab Wahab 2015 Ab Wahab, Nor Amarlia Consumer satisfaction Consumer complaints. Complaint letters Electronic Computers. Computer Science Database management The ability to manage customer's complaints well is very important to any organization. It helps to maintain a healthy relationship between the organization and its customer and keeps the customer satisfied. Teluk Pulai Primary School in Klang is currently experiencing problems in managing complaints which is they does not have a computerized system that is able to handling with complaints. The objectives of this project focus on identifying a set of requirements for a complaint management system, developing a prototype and validating the software requirements specification (SRS) using a prototype. As the school is unsure of what they want in the system, a requirement engineering technique adapted from iterative development was used in this project. To achieve all the objectives three phases‟ methodology involved in the beginning, the proposed technique provided a preliminary analysis. The next phase, which is planning phase, a set of use cases was identified and the number of iterations was determined and where each iteration was assigned specific use cases. Lastly, during the execution phase, there are three phases included. At each iteration during this phase, a detailed analysis of each use case was developed, a dynamic user interface prototype was created and validated by the school. In addition, during each iteration, the proposed improvements and recommendation was made and fed into the subsequent iterations. The result of analysis and funding of this project had been documented in the Software Requirements Specification (SRS). In the future, the outcome of this project which is the set of requirements that can be used to develop a complaint management system for educational institutions. 2015 Thesis https://ir.uitm.edu.my/id/eprint/41591/ https://ir.uitm.edu.my/id/eprint/41591/1/41591.pdf text en public degree Universiti Teknologi MARA, Cawangan Melaka Faculty of Computer and Mathematical Sciences Mohd Rusli, Hazlifah
institution Universiti Teknologi MARA
collection UiTM Institutional Repository
language English
advisor Mohd Rusli, Hazlifah
topic Consumer satisfaction
Consumer satisfaction
Consumer satisfaction
Database management
spellingShingle Consumer satisfaction
Consumer satisfaction
Consumer satisfaction
Database management
Ab Wahab, Nor Amarlia
Requirements engineering of e-complaint management system for Teluk Pulai Primary School, Klang Selangor using iterative development / Nor Amarlia Ab Wahab
description The ability to manage customer's complaints well is very important to any organization. It helps to maintain a healthy relationship between the organization and its customer and keeps the customer satisfied. Teluk Pulai Primary School in Klang is currently experiencing problems in managing complaints which is they does not have a computerized system that is able to handling with complaints. The objectives of this project focus on identifying a set of requirements for a complaint management system, developing a prototype and validating the software requirements specification (SRS) using a prototype. As the school is unsure of what they want in the system, a requirement engineering technique adapted from iterative development was used in this project. To achieve all the objectives three phases‟ methodology involved in the beginning, the proposed technique provided a preliminary analysis. The next phase, which is planning phase, a set of use cases was identified and the number of iterations was determined and where each iteration was assigned specific use cases. Lastly, during the execution phase, there are three phases included. At each iteration during this phase, a detailed analysis of each use case was developed, a dynamic user interface prototype was created and validated by the school. In addition, during each iteration, the proposed improvements and recommendation was made and fed into the subsequent iterations. The result of analysis and funding of this project had been documented in the Software Requirements Specification (SRS). In the future, the outcome of this project which is the set of requirements that can be used to develop a complaint management system for educational institutions.
format Thesis
qualification_level Bachelor degree
author Ab Wahab, Nor Amarlia
author_facet Ab Wahab, Nor Amarlia
author_sort Ab Wahab, Nor Amarlia
title Requirements engineering of e-complaint management system for Teluk Pulai Primary School, Klang Selangor using iterative development / Nor Amarlia Ab Wahab
title_short Requirements engineering of e-complaint management system for Teluk Pulai Primary School, Klang Selangor using iterative development / Nor Amarlia Ab Wahab
title_full Requirements engineering of e-complaint management system for Teluk Pulai Primary School, Klang Selangor using iterative development / Nor Amarlia Ab Wahab
title_fullStr Requirements engineering of e-complaint management system for Teluk Pulai Primary School, Klang Selangor using iterative development / Nor Amarlia Ab Wahab
title_full_unstemmed Requirements engineering of e-complaint management system for Teluk Pulai Primary School, Klang Selangor using iterative development / Nor Amarlia Ab Wahab
title_sort requirements engineering of e-complaint management system for teluk pulai primary school, klang selangor using iterative development / nor amarlia ab wahab
granting_institution Universiti Teknologi MARA, Cawangan Melaka
granting_department Faculty of Computer and Mathematical Sciences
publishDate 2015
url https://ir.uitm.edu.my/id/eprint/41591/1/41591.pdf
_version_ 1783734648579293184