Predictive model of maintenance cost in Malaysia rolling stock: a case study within urban rail / Mohd Firdaus Mohamad Idris
The first railway network in Malaysia commenced in 1885 which connected Taiping to Port Weld with the rail length of 13.6 km. Presently, the total length has since expanded to 2984 km. The revolution of the urban rail system occurred mostly in Klang Valley since the location is the main economic sou...
محفوظ في:
المؤلف الرئيسي: | Mohamad Idris, Mohd Firdaus |
---|---|
التنسيق: | أطروحة |
اللغة: | English |
منشور في: |
2022
|
الوصول للمادة أونلاين: | https://ir.uitm.edu.my/id/eprint/76150/1/76150.pdf |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
Maintenance of tunnels in Malaysia against good practice / Saiful Adnan Mohamad Idris
بواسطة: Mohamad Idris, Saiful Adnan
منشور في: (2004) -
Impact of COVID-19: evidence from Malaysian stock market / Mohamad Firdaus Jopri
بواسطة: Jopri, Mohamad Firdaus
منشور في: (2021) -
Development of safety and health costs model for urban rail infrastructure projects / Izatul Farrita Mohd Kamar
بواسطة: Mohd Kamar, Izatul Farrita
منشور في: (2020) -
Project cost management effectiveness : Implementation of rolling plan for Malaysia Plan /
بواسطة: Mohamad, Rizzuan, Shahrul Amri
منشور في: (2022) -
Study on the behaviour of the concrete sleeper / Mohamad Kamal Idris
بواسطة: Idris, Mohamad Kamal
منشور في: (1993)