Job satisfaction among migrant workers in construction industry: a case study on migrant workers at Batang Saribas Bridge no. 2 project in Maludam, Sarawak / Dayang Siti Zaima Abang Zainudin
The reason of this study is to look into how migrant workers' demographics, work environment, and socio-culture may affect how satisfied they are with their jobs in Batang Saribas Bridge No. 2 Project in Maludam, Sarawak. The study was done at the Batang Saribas Bridge No. 2 Project in Maludam,...
Saved in:
| Main Author: | |
|---|---|
| Format: | Thesis |
| Language: | English |
| Published: |
2024
|
| Subjects: | |
| Online Access: | https://ir.uitm.edu.my/id/eprint/95346/1/95346.pdf |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
