Job satisfaction among migrant workers in construction industry: a case study on migrant workers at Batang Saribas Bridge no. 2 project in Maludam, Sarawak / Dayang Siti Zaima Abang Zainudin
The reason of this study is to look into how migrant workers' demographics, work environment, and socio-culture may affect how satisfied they are with their jobs in Batang Saribas Bridge No. 2 Project in Maludam, Sarawak. The study was done at the Batang Saribas Bridge No. 2 Project in Maludam,...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2024
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/95346/1/95346.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my-uitm-ir.95346 |
---|---|
record_format |
uketd_dc |
spelling |
my-uitm-ir.953462024-06-05T00:11:42Z Job satisfaction among migrant workers in construction industry: a case study on migrant workers at Batang Saribas Bridge no. 2 project in Maludam, Sarawak / Dayang Siti Zaima Abang Zainudin 2024 Abang Zainudin, Dayang Siti Zaim H Social Sciences (General) Study and teaching. Research The reason of this study is to look into how migrant workers' demographics, work environment, and socio-culture may affect how satisfied they are with their jobs in Batang Saribas Bridge No. 2 Project in Maludam, Sarawak. The study was done at the Batang Saribas Bridge No. 2 Project in Maludam, Sarawak. It was a poll with 23 questions that the migrants were answering. A literature study was done to look at information about variables that are independent and dependent. According to the results, these things might have an effect on how job satisfaction might influence the migrants with theirjobs based on the independent variables. This research found that the migrant workers' job happiness at the Batang Saribas Bridge No. 2 Project in Maludam, Sarawak was not greatly affected by their demographics, work environment, or socio-culture background. 2024 Thesis https://ir.uitm.edu.my/id/eprint/95346/ https://ir.uitm.edu.my/id/eprint/95346/1/95346.pdf text en public degree Universiti Teknologi MARA Sarawak Faculty of Administrative Science and Policy Studies |
institution |
Universiti Teknologi MARA |
collection |
UiTM Institutional Repository |
language |
English |
topic |
H Social Sciences (General) H Social Sciences (General) |
spellingShingle |
H Social Sciences (General) H Social Sciences (General) Abang Zainudin, Dayang Siti Zaim Job satisfaction among migrant workers in construction industry: a case study on migrant workers at Batang Saribas Bridge no. 2 project in Maludam, Sarawak / Dayang Siti Zaima Abang Zainudin |
description |
The reason of this study is to look into how migrant workers' demographics, work environment, and socio-culture may affect how satisfied they are with their jobs in Batang Saribas Bridge No. 2 Project in Maludam, Sarawak. The study was done at the Batang Saribas Bridge No. 2 Project in Maludam, Sarawak. It was a poll with 23 questions that the migrants were answering. A literature study was done to look at information about variables that are independent and dependent. According to the results, these things might have an effect on how job satisfaction might influence
the migrants with theirjobs based on the independent variables. This research found that the migrant workers' job happiness at the Batang Saribas Bridge No. 2 Project in Maludam, Sarawak was not greatly affected by their demographics, work environment, or socio-culture background. |
format |
Thesis |
qualification_level |
Bachelor degree |
author |
Abang Zainudin, Dayang Siti Zaim |
author_facet |
Abang Zainudin, Dayang Siti Zaim |
author_sort |
Abang Zainudin, Dayang Siti Zaim |
title |
Job satisfaction among migrant workers in construction industry: a case study on migrant workers at Batang Saribas Bridge no. 2 project in Maludam, Sarawak / Dayang Siti Zaima Abang Zainudin |
title_short |
Job satisfaction among migrant workers in construction industry: a case study on migrant workers at Batang Saribas Bridge no. 2 project in Maludam, Sarawak / Dayang Siti Zaima Abang Zainudin |
title_full |
Job satisfaction among migrant workers in construction industry: a case study on migrant workers at Batang Saribas Bridge no. 2 project in Maludam, Sarawak / Dayang Siti Zaima Abang Zainudin |
title_fullStr |
Job satisfaction among migrant workers in construction industry: a case study on migrant workers at Batang Saribas Bridge no. 2 project in Maludam, Sarawak / Dayang Siti Zaima Abang Zainudin |
title_full_unstemmed |
Job satisfaction among migrant workers in construction industry: a case study on migrant workers at Batang Saribas Bridge no. 2 project in Maludam, Sarawak / Dayang Siti Zaima Abang Zainudin |
title_sort |
job satisfaction among migrant workers in construction industry: a case study on migrant workers at batang saribas bridge no. 2 project in maludam, sarawak / dayang siti zaima abang zainudin |
granting_institution |
Universiti Teknologi MARA Sarawak |
granting_department |
Faculty of Administrative Science and Policy Studies |
publishDate |
2024 |
url |
https://ir.uitm.edu.my/id/eprint/95346/1/95346.pdf |
_version_ |
1804889954193506304 |