The impact of Sejingkat coal-fired power plant on the water quality of Sarawak River
The demand for electricity is clearly associated with population growth. Thus, the Kuching Coal-Fired Power Plant located at Sejingkat area was built to cater for this needs. With the operation of Phase II, the impact to the water quality of the Sarawak River is not known. In view of this fact, s...
محفوظ في:
المؤلف الرئيسي: | |
---|---|
التنسيق: | أطروحة |
اللغة: | English |
منشور في: |
2006
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://ir.unimas.my/id/eprint/14815/1/Anita%20Bruin%20ft.pdf |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|