A Modified Multi-Step Crossover Fusion (MSXF) In Solving Some Deterministic Job Shop Scheduling Problem (JSSP) [TS157.5. M214 2008 f rb].
This thesis addresses the job shop scheduling problem (JSSP) with the objective of minimising the makespan value. Tesis ini membincangkan masalah penskedulan kerja kedaian (JSSP) dengan objektif untuk meminimumkan masa operasi.
Saved in:
主要作者: | Omar, Mahanim |
---|---|
格式: | Thesis |
語言: | English |
出版: |
2008
|
主題: | |
在線閱讀: | http://eprints.usm.my/9513/1/A_MODIFIED_MULTI-STEP_CROSSOVER_FUSION_%28MSXF%29_IN_SOLVING_SOME_DETERMINISTIC_JOB_SHOP_SCHEDULING_PROBLEM_%28JSSP%29.pdf |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
相似書籍
-
Comparative Study Between Mixed Model Assembly Line And Flexible Assembly Line Based On Cost Minimization Approach [TS167. F278 2008 f rb].
由: Fawad Ahmed, Fawad Ahmed
出版: (2008) -
Comparative Study Between Mixed Model Assembly Line And Flexible Assembly Line Based On Cost Minimization Approach [TS167. F278 2008 f rb].
由: Ahmed, Fawad
出版: (2008) -
A Proposed Single EWMA Chart Combining The X And R Charts For A Joint Monitoring Of The Process Mean And Variance [TS156. Y46 2008 f rb].
由: Yeong, Kah Wai
出版: (2008) -
Visual Inspection System To Detect Connector Tilts In PCBAs [TS156. V844 2005 f rb] [Microfiche 7845].
由: Retnasamy, Vithyacharan
出版: (2005) -
GA Based Feature Recognition of Step File for CAD/CAM Integration
由: Syafnil, Alfais Admiral
出版: (2009)