Development Of Overall Performance Effectiveness In Job Shop Manufacturing Process
Overall equipment effectiveness (OEE) is implemented by the case company,an aerospace part manufacturing company, to encourage machines to operate all the time at the ideal speed and produce no quality defect in extreme case.However,integration between workstations and transporting activities,deviat...
محفوظ في:
المؤلف الرئيسي: | Teoh, Yong Siang |
---|---|
التنسيق: | أطروحة |
اللغة: | English English |
منشور في: |
2018
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://eprints.utem.edu.my/id/eprint/23380/1/Development%20Of%20Overall%20Performance%20Effectiveness%20In%20Job%20Shop%20Manufacturing%20Process.pdf http://eprints.utem.edu.my/id/eprint/23380/2/Development%20Of%20Overall%20Performance%20Effectiveness%20In%20Job%20Shop%20Manufacturing%20Process.pdf |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
Customer demand and planning efficiency in overall equipment effectiveness (OEE)
بواسطة: Teoh, Yong Siang
منشور في: (2013) -
Implementation of overall equipment effectiveness in surface mounting technology
بواسطة: V. Nanjan, Davandran
منشور في: (2019) -
Optimization-based simulation algorithm for predictive-reactive job-shop scheduling of reconfigurable manufacturing systems
بواسطة: Tan, Joe Yee
منشور في: (2022) -
Measuring Overall Equipment Effectiveness Of Pressure Die Casting Machine
بواسطة: Jiga, Elnie Carina
منشور في: (2019) -
New overall equipment effectiveness framework development with integration of maynard operation sequence technique for losses visualization
بواسطة: Yoong, Sai Sieng
منشور في: (2018)