Risk assessment of time and cost overrun factors throughout construction project lifecycle
Construction industry is a very important industry for the economic development of the country. However, this industry has been facing serious problems i.e. failure to complete projects within stipulated time and cost. Hence, the aim of this study is to assess the risk of various factors that...
Saved in:
主要作者: | |
---|---|
格式: | Thesis |
语言: | English English English |
出版: |
2014
|
主题: | |
在线阅读: | http://eprints.uthm.edu.my/1479/1/24p%20ISMAAINI%20ISMAIL.pdf http://eprints.uthm.edu.my/1479/2/ISMAAINI%20ISMAIL%20COPYRIGHT%20DECLARATION.pdf http://eprints.uthm.edu.my/1479/3/ISMAAINI%20ISMAIL%20WATERMARK.pdf |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|