Improvement of the SAG ampacity carrying level of existing 275 kV overhead line tower by using the re-conductoring approach

This project presents a methodological approach, suggestions and information in uprating the existing 275kV transmission overhead line by using the re-conductoring approach. Overhead transmission line conductors were given priority in information. Calculation regarding the maximum sag and maximum...

Full description

Saved in:
Bibliographic Details
Main Author: Mahmod, Luqman Hakim
Format: Thesis
Language:English
English
English
Published: 2012
Subjects:
Online Access:http://eprints.uthm.edu.my/2272/1/24p%20LUQMAN%20HAKIM%20MAHMOD.pdf
http://eprints.uthm.edu.my/2272/2/LUQMAN%20HAKIM%20MAHMOD%20COPYRIGHT%20DECLARATION.pdf
http://eprints.uthm.edu.my/2272/3/LUQMAN%20HAKIM%20MAHMOD%20WATERMARK.pdf
Tags: Add Tag