Bottleneck-based heuristic for three-machine flow shop scheduling

This paper considers a 3 machine flow shop (M1M2M3) with tendency of dominant (bottleneck) machine at M1. The developed bottleneck based heuristics from previous studies are considered in this case by Hezzeril (2010) and Irwan (2010), but were only tested for dominant machine at M2 and M3 respect...

全面介绍

Saved in:
书目详细资料
主要作者: Abdul Rahim, Mohd Salleh
格式: Thesis
语言:English
English
English
出版: 2011
主题:
在线阅读:http://eprints.uthm.edu.my/2724/1/24p%20MOHD%20SALLEH%20ABDUL%20RAHIM.pdf
http://eprints.uthm.edu.my/2724/2/MOHD%20SALLEH%20ABDUL%20RAHIM%20COPYRIGHT%20DECLARATION.pdf
http://eprints.uthm.edu.my/2724/3/MOHD%20SALLEH%20ABDUL%20RAHIM%20WATERMARK.pdf
标签: 添加标签
没有标签, 成为第一个标记此记录!