Bottleneck-based heuristic for three-machine flow shop scheduling
This paper considers a 3 machine flow shop (M1M2M3) with tendency of dominant (bottleneck) machine at M1. The developed bottleneck based heuristics from previous studies are considered in this case by Hezzeril (2010) and Irwan (2010), but were only tested for dominant machine at M2 and M3 respect...
Saved in:
主要作者: | |
---|---|
格式: | Thesis |
语言: | English English English |
出版: |
2011
|
主题: | |
在线阅读: | http://eprints.uthm.edu.my/2724/1/24p%20MOHD%20SALLEH%20ABDUL%20RAHIM.pdf http://eprints.uthm.edu.my/2724/2/MOHD%20SALLEH%20ABDUL%20RAHIM%20COPYRIGHT%20DECLARATION.pdf http://eprints.uthm.edu.my/2724/3/MOHD%20SALLEH%20ABDUL%20RAHIM%20WATERMARK.pdf |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|